Make use of surplus solar
When solar generation exceeds site demand, the battery can absorb some of the surplus if it has room to charge. The stored energy can then be used when site demand rises or solar output drops.
UK industrial estate · deployment example
When solar generation exceeds site demand, the battery can absorb some of the surplus if it has room to charge. The stored energy can then be used when site demand rises or solar output drops.
Battery discharge and solar generation share the same grid connection. The EMS must account for both alongside site demand when scheduling battery discharge.
Any flexibility dispatch needs to fit within the battery's available capacity and the site's export headroom. The same capacity cannot be reserved for two services at the same time.
These illustrative numbers explain the control logic. The estate's meter readings and settings are undisclosed.
Share your generation capacity, site load, battery details and agreed export limit so we can discuss how dispatch would work at your site.
Send an enquiry